Contractor A
$198,400
Base bid
- Included
- Mill 2", overlay, striping, limited curb repair
- Exclusions
- Drainage structures; soft spots beyond unit allowance
- Alternates
- Full-depth repair add: $24,000
- Schedule / warranty
- 18 working days · 2-year pavement
- Scope gaps
- No geotech contingency language
- Normalized
- $210,000 est. apples-to-apples
- SSI observation
- Lowest base; scope thinner on soft-spot allowance